本規范共分12章,主要內容包括總則、術語、基本規定、施工準各、吊耳、地基處理、吊裝繩索、吊裝機具、起重機吊裝、液壓裝置吊裝、桅桿吊裝、設備平移。
GB50798-2012······1
1 總則······11
2 術語······12
3 基本規定······15
4 施工準備······18
4.1 技術準備······18
4.2 起重機械、吊索、吊具淮備······21
4.3 施工現場準備······21
4.4 設備現場調整······21
5 吊耳······23
5.1 一般規定······23
5.2 吊蓋式吊耳······24
5.3 板式吊耳······26
5.4 管軸式吊耳······26
5.5 吊耳安裝位置加固······29
6 地基處理······31
7 吊裝繩索······32
7.1 麻繩······32
7.2 鋼絲繩······32
7.3 鋼絲繩繩扣······34
7.4 無接頭鋼絲繩繩圈······35
7.5 合成纖維吊裝帶······36
8 吊裝機具······38
8.1 滑輪(組)······38
8.2 手拉葫蘆······38
8.3 卷揚機······39
8.4 千斤頂······39
8.5 鋼絲繩繩夾······40
8.6 卸扣······42
8.7 平衡梁······42
8.8 地錨······43
9 起重機吊裝······45
9.1 一般規定······45
9.2 吊裝方法······45
9.3 起重機選擇與布置······46
9.4 安全規定······48
10 液壓裝置吊裝······49
10.1 一般規定······49
10.2 液壓設備······49
10.3 鋼絞線與方鋼······50
10.4 吊裝方法······51
10.5 安全規定······51
11 桅桿吊裝······53
11.1 一般規定······51
11.2 桅桿的豎立、移動與拆除······54
11.3 吊裝方法······56
11.4 安全規定······57
12 設備平移······59
12.1 一般規定······59
12.2 平移設施安裝······59
12.3 平移方法······60
12.4 安全規定······61
本規范用詞說明······62
引用標準名錄······63
附:條文說明······65
2 術語······67
3 基本規定······68
4 施工準備······69
4.1 技術準備······69
5 吊耳······70
5.1 一般規定······70
5.2 吊蓋式吊耳······70
6 地基處理······72
7 吊裝繩索······73
7.2 鋼絲繩······73
8 吊裝機具······74
8.7 平衡粱······74
8.8 地錨······76
9 起重機吊裝······78
9.1 —般規定······78
9.3 起重機選擇與布置······78
10 液壓裝置吊裝······79
10.3 鋼絞線與方鋼······79
10.4 吊裝方法······79
11 桅桿吊裝······80
11.3 吊裝方法······80
11.4 安全規定······80
12 設備平移······81
12.1 一般規定······81
12.2 平移設施安裝······81
下載地址
同類標準
GB/T51147-2015:硝胺類廢水處理設施技術規范
時間:2024-02-25 20:13:53GB/T51241-2017:管道外防腐補口技術規范
時間:2024-02-25 20:13:27GB/T51264-2017:雙向拉伸薄膜工廠設計標準
時間:2024-02-25 20:12:15GB/T51259-2017:腈綸設備工程安裝與質量驗收規范
時間:2024-02-25 20:13:02GB51237-2017:火工品試驗室工程技術規范
時間:2024-02-25 20:12:37GB50488-2018:腈綸工廠設計標準
時間:2024-02-25 20:11:48